A blank field-to-report record for ship ultrasonic thickness measurement work. It keeps every thickness value connected to the correct structure, drawing, surface condition, instrument setup, recheck decision and authorised report disposition.

Technical evidence resourceHull gauging · UTMPublished 4 September 2026Vessel Doctor Technical Team
Quick answer

A defensible UTM report needs more than a list of millimetre values. Fix the survey basis and location scheme, verify the instrument and material setup, record surface and coating conditions, preserve anomalous readings and rechecks, and separate factual measurements from renewal or acceptance decisions owned by the authorised reviewer.

01 · DECISION AND GOVERNING BASIS

Define who needs the readings and what they may decide.

Record whether the job supports class survey, owner condition assessment, repair planning, corrosion mapping, damage investigation, dry-dock scope, sale-and-purchase review or a limited engineering check. Each purpose can require a different location schedule, extent, witness route, reporting form and acceptance owner. The applicable class rules, survey programme, approved drawings and attending surveyor instructions take precedence over a generic website checklist.

Blank scope and acceptance-owner register
FieldRequired entrySource / ownerOpen item
Vessel, survey and structural scope
Drawing revision and location schedule
Rule / programme / report format
Witness and acceptance owner
Access, safety and coating limits
Exclusions and escalation route
Protected commercial route.

Use the ship ultrasonic-thickness measurement service for commercial scope. Use the established ship UTM preparation guide for access, cleaning, drawings and survey readiness. This record serves the different field-to-report handover intent.

02 · STRUCTURAL MAP AND POINT ID

Make the location reproducible without guesswork.

Before reading, assign each point to vessel, side, frame, longitudinal, strake or plate, compartment, structural member and face. Reference a controlled drawing revision and mark whether the point was planned, expanded after an anomaly or substituted because safe access was unavailable. Photographs can help orientation, but they do not replace a marked drawing and must not disclose vessel information without permission.

Blank drawing and measurement-location register
Point IDDrawing / frame / strakeMember / faceNominal thickness sourceAccess / surfacePlanned / expanded / substitute
UTM-___
UTM-___
UTM-___
UTM-___

Do not infer nominal or renewal thickness from memory. Record the source and revision beside the point. Where class or the owner controls the location set, record additions and omissions with the person authorising them.

03 · INSTRUMENT, MATERIAL AND SURFACE SETUP

Trace the value through the complete measurement chain.

Record instrument, probe, serial numbers, range, resolution, calibration status, reference blocks, couplant and velocity basis. Note material and coating assumptions, surface preparation, curvature, temperature, corrosion profile and any limitation affecting coupling or echo interpretation. ISO 16809:2025 specifies principles for ultrasonic thickness determination using pulse time of flight; it does not itself replace the vessel-specific survey programme or acceptance criteria.

Blank instrument, reference and field-check register
Instrument / probeCalibration evidenceReference block / thicknessVelocity / materialPre-checkPost-checkLimitation
UTM-01 / ___

If through-coating mode, multiple-echo technique or a correction is used, state it. Retain screenshots or A-scan evidence when required by the method or reviewer. A stable numerical display does not prove the correct back-wall echo was selected.

04 · READING AND QUALITY REGISTER

Keep the first value, confirmation and disposition together.

Record the initial reading, repeated reading, retained value and reason for any rejection. Include units, instrument setup ID, operator, time and local condition. Where pitting or uneven corrosion is present, define how the reported value represents the agreed area and do not silently average away a local minimum.

Blank point-by-point reading and quality record
Point / timeInitial mmRepeat mmRetained mmSetup IDCondition / echo qualityDisposition
UTM-___ / ___
UTM-___ / ___
UTM-___ / ___
UTM-___ / ___

Report factual thickness separately from diminution, remaining percentage, corrosion rate or renewal assessment. Derived conclusions require a documented nominal-thickness source, calculation rule, previous comparable record and authorised acceptance basis.

05 · ANOMALY AND EXPANDED-GAUGING WORKFLOW

Escalate unusual readings without overwriting them.

An anomalous value can arise from real wastage, pitting, lamination, coating, poor coupling, wrong velocity, curvature, geometry or an incorrect location reference. Preserve the original record, repeat after a controlled setup check, move to adjacent points if authorised, and document the reviewer decision. Do not delete the first value because the later reading looks more convenient.

Blank anomaly, verification and escalation record
Point / triggerOriginal evidenceSetup and surface checkAdjacent / repeat pointsReviewerRequired actionFinal status
UTM-___
UTM-___
UTM-___

Repair or steel-renewal decisions belong to the responsible owner, yard, designer, class surveyor or other authorised reviewer. Vessel Doctor should not imply class approval, recognised thickness-measurement-company status or acceptance unless documented for the exact entity and scope.

06 · MATCHED RECHECK AND CHANGE CONTROL

Compare only genuinely comparable readings.

A post-cleaning, post-repair or verification reading should reference the same drawing, point, surface, side, probe/setup and reporting rule. If the original point no longer exists after renewal, map the new plate and clearly state that it is a replacement baseline rather than a repeated measurement of the old material.

Blank baseline-to-recheck comparison
Point / drawingBaseline date / setupAction or changed conditionRecheck date / setupResultComparable?Reviewer disposition
UTM-___
UTM-___
UTM-___

For trend analysis, confirm that previous reports used compatible location IDs, nominal-thickness sources and methods. Apparent change smaller than the combined measurement and location uncertainty should not be presented as a confident corrosion rate.

07 · REPORT RELEASE GATE

Release a traceable record, not an unsupported approval.

  • Identify vessel, scope, date, location, drawing revision and governing instruction.
  • List personnel, witness, instrument, probe, calibration and field checks.
  • Show point IDs and all retained readings with units and local conditions.
  • Keep anomalies, exclusions, substitutions and expanded gauging visible.
  • Separate measured values from calculations, interpretation and acceptance decisions.
  • Attach marked plans, photographs or screenshots only with permission.
  • Record revisions, reviewer comments and final distribution.
Blank report review and release record
Report / revisionTechnical checkerScope reconciledAnomalies closedAttachments controlledAcceptance ownerRelease date
UTM-RPT-___
No fabricated proof.

The tables are blank structures. They do not represent a completed vessel, customer, reading, class result, repair decision or business outcome.

08 · CURRENT PRIMARY SOURCES

Use the current measurement principle and the applicable vessel rules.

IACS publishes requirements and recommendations; it does not approve suppliers. Confirm the current class, flag, owner and contract requirements before attendance.

NEXT STEP

Turn the record into a controlled gauging plan.