Ship Vibration Survey Field Record Pack

Use this blank, print-ready record to scope, witness and review occupied-space and structural-response measurements on a vessel. It keeps the complaint, decision, operating condition, location, axis, instrument channel and matched retest connected without turning a field reading into an unsupported acceptance claim.

Technical evidence resourceHabitability + structural responsePublished 29 August 2026Vessel Doctor Technical Team
Quick answer

A ship-vibration result is useful only when the receiver or structure, measurement axis, mounting, processing, operating state and decision basis are recorded together. Human-response and structural-response data may share an operating log, but they answer different questions and should retain separate conclusions.

01 · DECISION BOUNDARY

Choose the survey by the decision, not by the symptom alone.

“The ship vibrates” can describe discomfort in a cabin, motion of a deck or panel, a machinery fault, shafting behaviour or a transient caused by a particular operating combination. Before selecting points, record what must be decided, who will use the report, which vessel conditions can be reproduced and which acceptance document—if any—actually governs the work.

Habitability decision

Comfort or human-response evaluation in cabins, offices, control rooms, mess rooms, passenger areas or other occupied spaces.

Structural decision

Deck, hull, superstructure, panel, foundation or transmission-path response; resonance or source-path-receiver diagnosis.

Machinery boundary

Machine condition, bearing or casing behaviour belongs in a machinery diagnostic scope unless used only as a reference channel.

Torsional boundary

Angular oscillation in shafting requires torsional methods and should not be inferred from an occupied-space accelerometer alone.

Use the established canonicals

For human-response decisions use the whole-body and habitability vibration survey. For hull, deck, foundation or mode-response decisions use the structural and hull vibration survey. A combined attendance may share time and operating references while keeping evaluation methods and conclusions distinct.

02 · SCOPE REGISTER

Freeze the governing inputs before the test day.

Record the request, vessel state, spaces or structures, decision owner, witnessing parties, required operating points, planned measurement quantities, report deliverables and exclusions. If a specification, comfort notation, class rule, flag instruction or standard is named, identify the exact edition and clause supplied by the project. Publication status alone does not amend a signed contract, and a supplier should not imply that IACS, a class society or a flag has approved the supplier.

Blank vibration survey scope and acceptance register
Scope IDDecision / recipientSpaces or structureRequired conditionBasis / edition / clauseWitness / reviewExclusions
SCOPE-____________Contract / rule / standard / diagnostic______
SCOPE-____________Contract / rule / standard / diagnostic______

Keep a copy or controlled reference for every governing document. If the project cannot confirm the basis before attendance, report the measurements and limitations without converting an indicative comparison into a formal pass statement.

03 · COMPLAINT AND RECEIVER MAP

Translate a felt symptom into reproducible receiver evidence.

Interview wording is evidence about when and where the symptom occurs, not a diagnosis. Mark the exact berth, cabin, bunk, seat, work position, deck bay, bulkhead, panel or equipment foundation. Record who experiences or observes the issue, the body posture or activity, start and stop conditions, dominant direction, audible rattle, visible motion and whether the response changes with shaft speed, engine load, thruster use, heading, sea state or nearby machinery.

Blank complaint and receiver map
Receiver IDLocation / deck / framePosture or structureSymptom / directionStart-stop conditionActivity / occupancyPhoto / drawing
REC-______Standing / seated / lying / deck / panel______ RPM / load / mode___REF-___
REC-______Standing / seated / lying / deck / panel______ RPM / load / mode___REF-___

The practical ship cabin vibration at certain RPM guide explains why a narrow operating band can produce a strong response without identifying the source by itself.

04 · OPERATING MATRIX

Synchronise every channel with the condition that produced it.

Ship response can vary with engine or shaft RPM, propeller pitch, vessel speed, displacement, trim, draught, loading condition, heading, sea state, water depth, thruster use, generator and pump combinations, HVAC operation and mooring condition. Select only variables relevant to the decision, but record them at each run rather than relying on a test-day summary. Use a shared time source where instruments and bridge or engine logs must be correlated.

Blank operating-condition and run matrix
Run / timePropulsion RPM / pitchSpeed / draught / trimMachinery lineupHeading / sea / depthStable periodDeviation / event
RUN-01 / __________________ min___
RUN-02 / __________________ min___
RUN-03 / __________________ min___

For a controlled speed sweep, predefine the step size, hold time, direction of change and safe excluded ranges. A run-up and coast-down may reveal different behaviour. Any operating restriction remains the vessel operator’s safety decision.

05 · INSTRUMENT AND CHANNEL REGISTER

Make locations, axes and processing auditable.

Assign a channel ID before recording. Capture the accelerometer or transducer identity, calibration certificate or field-check reference, mounting method, orientation, measurement quantity, units, amplitude convention, sampling rate, record duration, frequency range, weighting, filtering, integration and analysis settings. Note cable routing, magnetic or adhesive mounting limitations, local surface condition and any channel saturation or dropout.

Blank instrument, calibration and channel register
Channel IDReceiver / source pointAxis / mountingSensor / certificateQuantity / unitsRange / duration / weightingField check
CH-___REC-___ / SRC-___X / Y / Z / other___ / CERT-_________Before / after
CH-___REC-___ / SRC-___X / Y / Z / other___ / CERT-_________Before / after
Calibration boundary

A certificate supports instrument traceability. It does not prove that the correct point, axis, attachment, frequency range, weighting, operating state or acceptance basis was selected. Those decisions must remain visible in the field and report records.

06 · OCCUPIED-SPACE PLAN

Keep human-response measurements tied to actual use.

For occupied spaces, record the receiver position and body relationship: floor location, bunk or seat, posture, contact surface, activity and measurement axes. Identify whether the purpose is comfort, complaint investigation, workplace exposure or an agreed vessel-acceptance test. These intents are not interchangeable. The selected frequency weighting, evaluation quantity, duration and spatial plan should follow the confirmed project basis and competent technical review.

Blank occupied-space measurement plan
Space / receiverUse / postureFloor / seat / bunk pointAxesActivity / occupancyEvaluation recordLimitation
___ / REC-___Cabin / work / passenger / other___X / Y / Z_________
___ / REC-___Cabin / work / passenger / other___X / Y / Z_________

The current habitability reference and legacy-contract guide explains the published replacement relationship between the current and withdrawn ship-habitability documents. Confirm the actual contractual edition rather than assuming the newest publication automatically controls.

07 · STRUCTURAL RESPONSE PLAN

Separate source, path and receiver before assigning cause.

Structural work may require response points on a deck, shell, superstructure, bulkhead, panel, foundation or support together with reference channels near propulsion or machinery excitation. Show coordinates using deck, frame, longitudinal and vertical references. Record direction, local stiffness or boundary condition, nearby discontinuities, added mass, loose fittings and whether the point represents global response, local response or a suspected transmission path.

Blank source-path-receiver structural plan
Point IDDeck / frame / coordinateSource, path or receiverDirection / boundaryReference channelOperating runsDrawing / photo
STR-______Source / path / receiver___CH-___RUN-___REF-___
STR-______Source / path / receiver___CH-___RUN-___REF-___

A response peak at a steady speed can support a resonance hypothesis, but a defensible mode or source conclusion may need a controlled sweep, phase relationships, operational deflection information, modal testing, calculation or other corroboration. Record what was measured and what remains untested.

08 · RUN VALIDITY LOG

Reject or qualify data before it reaches the conclusion.

Review each run for stable speed and load, correct operating lineup, adequate record duration, sensor security, synchronisation, overload, dropout, transient events, movement near the receiver, doors or panels rattling and unplanned changes in sea or mooring condition. Repeat a run while conditions are still available when a validity check fails.

Blank run-validity and deviation log
RunCondition achieved?Signals valid?Transient / interferenceAccept, repeat or qualifyReviewer / time
RUN-___Yes / no / qualifiedYes / no / qualified_________
RUN-___Yes / no / qualifiedYes / no / qualified_________
09 · REPORT RELEASE GATE

Make the evidence and limitations reviewable.

  • The decision, vessel condition, spaces or structures, exclusions and recipients match the approved scope.
  • Every reported result has a receiver or structural point, axis, channel setup, run and operating-state reference.
  • Measurement quantity, units, amplitude convention, frequency range, weighting, duration and processing are unambiguous.
  • Applicable document, edition, clause, project specification and any class or flag review role are stated factually.
  • Measured facts, evaluation, diagnostic interpretation, confidence and untested alternatives are separated.
  • Invalid, unavailable or non-equivalent conditions remain visible rather than being omitted from the narrative.
  • Plots, tables, photographs and drawings use consistent identifiers and readable scales.
  • Recommended investigation, repair, operating restriction or matched retest identifies the decision owner.

A report can support a buyer, owner, yard, designer, manager, class or flag review, but the reviewer controls its own acceptance process. Vessel Doctor should not claim approval, authorisation or guaranteed acceptance unless a specific, current document proves it.

10 · MATCHED RETEST AND ANONYMISED CASE

Prepare real proof without inventing a result.

Before corrective work, freeze the points, axes, setup, RPM or speed steps, machinery lineup, loading condition and evaluation outputs needed for a matched retest. After the action, record every unavoidable difference. A percentage change is meaningful only when the compared records are sufficiently equivalent and the calculation basis is shown.

Trigger and decision

What complaint, acceptance question or structural symptom initiated the work, and who needed the answer?

Controlled baseline

Which receivers, structural points, axes, operating runs and setup records formed the baseline?

Finding boundary

What response or relationship did the data support, and which source or mode hypotheses remained untested?

Action record

What repair, stiffening, isolation, balancing, operating change or further investigation was approved?

Matched verification

Which conditions and channels were repeated, what differed and how was the result evaluated?

Publication permission

Who approved disclosure, which identifiers were removed and which text, images and figures may be published?

No fabricated case proof

This is an empty case structure, not a customer result. Do not add a vessel, customer, yard, class society, flag, defect, pass statement, numerical improvement, testimonial or business outcome without contemporaneous project evidence and written publication permission.

11 · CURRENT TECHNICAL SOURCES

Confirm the document that controls the actual project.

  • ISO 20283-5:2016 describes measurement, evaluation and reporting of vibration with regard to habitability on passenger and merchant ships.
  • ISO 6954:2000 is listed by ISO as withdrawn, with ISO 20283-5:2016 identified as the new version.
  • ISO 20283-2:2008 addresses measurement of structural vibration on ships excited by propulsion machinery.
  • ISO 2631-1:1997 provides general requirements for evaluating human exposure to whole-body vibration.

The official records establish document identity, publication status and broad scope. They do not establish which document, limit, notation or acceptance process applies to a particular vessel. Confirm current status, amendments, contract language, class rules, flag instructions, vessel type and competent-review requirements when the scope is agreed.

NEXT STEP

Turn the blank record into a controlled onboard plan.

Send the affected spaces or structure, vessel particulars, symptom, RPM or speed band, operating conditions, governing document and required decision. The point plan, witness sequence and report evidence can then be scoped before attendance.

Request a vibration survey scopeReview habitability measurementsReview structural measurements